Concrete Grinding and Surface Prep in Ottawa
The stage everything else depends on. If the surface is wrong, the coating on top of it will be wrong too.
COAT 01Included
What is included
Surface preparation is the work that makes a coating or a polish possible. It is also the part of the job that is easiest to skip and hardest to see until something fails.
- Removal of old coatings, paint, sealer and adhesive.
- Grinding of high spots and the weak top layer of the concrete.
- Opening the surface so a primer can bond.
- Crack and control joint repair.
- Dust extraction and containment through the work.
- A clean, vacuumed slab ready for the next stage.
COAT 02Method
Why grinding, not acid etching
Acid etching was the traditional way to prepare a slab for a coating. It opens the surface chemically, but it leaves salts behind, it does not profile the concrete evenly and it does nothing about old coatings or high spots. Grinding does all three jobs mechanically and leaves a surface that can be checked.
Grinding also lets the surface be read. A slab that has been ground shows its cracks, its patches and its variations honestly, before a coating covers them.
COAT 03Dust
Dust control
Grinding produces fine dust, and fine dust travels. The grinder runs with dust extraction, and the work area is contained with sheeting where the space allows it. Doorways, returns and HVAC openings are protected, and the floor is vacuumed before the next stage begins.
In an occupied home, the work is zoned so the rest of the house stays usable. In a commercial space, the containment is planned with the same care as the phasing, because dust in a stockroom or a shop is a problem the client notices immediately.
COAT 04Uses
Grinding without a coating
Not every grinding job leads to a coating. A slab may be ground to remove a failed sealer, to flatten a high spot before another trade works on it, or to prepare for a polish. Adhesive removal before a new floor covering is another common reason.
In those cases the scope stops at preparation: the surface is ground, the dust is removed and the slab is handed over ready for the next stage.
COAT 05Timing
When to schedule
Grinding is interior work and can run through the winter in a heated building. In an unheated garage, the grinding itself can be done in cold weather, but any coating that follows still needs the slab in range, so the two stages are usually kept together in a warmer month.
Preparation is also the stage to schedule first when a floor is failing. Understanding why the old coating let go is the only way to decide whether a repair, a recoat or a full strip is the right answer.
COAT 06Questions
Surface prep questions
Can you remove old tile adhesive?
Usually, yes. Adhesive is removed with the grinder and the right tooling, and the residue is checked before any coating or polish is planned. Some adhesive has soaked into the slab and needs more than one pass.
Will grinding leave dust in the house?
Grinding runs with dust extraction and the work area is contained with sheeting where it can be. Doorways and returns are protected, and the floor is vacuumed before the next stage.
Can you grind a floor that is out of level?
Grinding removes high spots and brings the surface flat enough for a coating. It is not a levelling fix. Where a slab has a significant slope or a low area, a patching compound is part of the scope.
How much concrete does grinding remove?
It depends on the finish and the tooling. A light pass opens the surface, while a deeper pass for a full aggregate polish removes more. The exposure decision is made before the first pass.