Our process
Ten stages, in order, from the first visit to the walkthrough. The order is not flexible, because each stage depends on the one before it.
COAT 01Visit
Consultation and site visit
The first visit is about the room as much as the floor. We look at how the space is used, how it drains, where the light falls and what has to move before work can start. We measure the area, check the edges and the apron, and look at the slab where it meets the walls and the door. Most of the questions that matter later come up here: moisture, cracks, old coatings and access.
COAT 02Assessment
Slab and moisture assessment
Moisture testing comes before the system is chosen. The reading tells us whether the slab is releasing water at a rate a standard primer can handle, or whether the build up needs a moisture tolerant primer. We also sound the slab for hollow spots, record cracks and joints, and check how the concrete was finished. A power trowelled slab and a broom finished slab hold a coating differently.
COAT 03Scope
Written scope
The scope sets out what will be done, in what order, and what is excluded. It covers preparation, repairs, the system and the number of coats, the cure sequence and the access arrangements. If a repair is uncertain until an old coating comes off, the scope says so, and we agree on how that will be handled before the work begins.
COAT 04Access
Clearing the space
The room has to be empty and the floor clear. Dust from grinding travels, so adjoining spaces get protected and the work area gets sealed where it can be. In a garage, that means moving storage, shelving and anything standing on the floor. In a commercial space, it means agreeing which areas close and when.
COAT 05Preparation
Grinding and repairs
Diamond grinding removes old coatings, adhesive, cure compounds and the weak top layer of the concrete. The grinder runs with dust extraction, and the surface is vacuumed before any repair. Cracks and joints are opened, cleaned and filled with an epoxy mortar. Spalled edges and hollow spots are cut back to sound concrete and rebuilt. The floor is checked again before the primer.
This is the slowest part of the job and the one that decides the rest. A floor that is ground properly, with the repairs done and the dust removed, gives the primer something to hold.
COAT 06Primer
Primer
The primer is the bond between the slab and the body coat. It is applied at a rate that suits the porosity of the concrete, and it is left to cure until it can take the next coat without being pulled around. Where the slab is unusually porous, a second pass may be needed.
COAT 07Body coat
Body coat, broadcast and metallic layers
The body coat carries the colour and the thickness. In a flake system, the flake is broadcast into the wet body coat, either fully or partially, and the excess is scraped back once the coat has set. In a metallic system, the resin is poured and worked by hand, and the movement in the surface comes from how it is moved rather than from a pattern. Solid colour systems skip the broadcast and go straight to the topcoat.
COAT 08Topcoat
Topcoat
The topcoat is the wear layer. It seals the flake, sets the sheen and gives the floor its resistance to traffic and cleaning. Epoxy or polyaspartic is chosen depending on the room, the light and how quickly the space needs to come back into use. It is applied in a controlled thickness, and the floor is closed to traffic while it cures.
COAT 09Cure
Cure time before foot and vehicle traffic
Cure time depends on the product and the conditions. Foot traffic, furniture and vehicles each come at a different point, and slab temperature and humidity both move those points. We give you the timings for your floor in writing at handover, along with care notes for the first weeks.
COAT 10Handover
Final walkthrough
We walk the floor with you, check the edges, joints and finish, and go over cleaning and care. Anything that needs attention is noted and dealt with. The walkthrough is also when the traffic timings are confirmed against the actual conditions in the room.
COAT 11Questions
Common questions
Do I need to empty the garage before the work starts?
Yes. The floor has to be clear, and dust travels, so shelving and storage come out before grinding begins. We set out the access arrangements in the scope.
How long will the space be out of use?
It depends on the system, the repairs and the cure conditions. The scope sets out the sequence and the days the space is unavailable, and we confirm the traffic timings at handover.
Can you work around business hours?
Where access allows, yes. Commercial floors are often done in phases or outside operating hours, which costs more in setup and cure windows but keeps the business running.
Does weather affect indoor work?
The weather outside matters less than the conditions inside. Slab temperature, air temperature and humidity drive the cure, and we monitor them through the work.
Is a primer used on every floor?
Generally yes, because the primer is the bond between the slab and the body coat. The type and the number of passes depend on how porous the concrete is.
COAT 12Start a project
Request a consultation
Tell us about the room, the slab and the timing. We reply by email, usually with a few questions about moisture, access and how the floor will be used.
Prefer email? info@epoxyflooringorleans.com