EPOXY FLOORINGOrleans

Commercial and Industrial Epoxy in Ottawa

Large floors, working buildings and a schedule that has to fit around operations. The preparation is the same discipline at a bigger scale.

COAT 01Included

What is included

A commercial floor is specified around traffic, cleaning and downtime. The system has to suit the way the space is used, and the work has to fit the hours the business can give up.

  • A site assessment that covers the slab, the traffic and the access.
  • A phasing plan that sets out which areas close and when.
  • Diamond grinding and coating removal across the full area.
  • Crack, joint and patch repair before the primer.
  • A system chosen for the traffic, the cleaning routine and the cure window.
  • A handover walkthrough with care notes for the maintenance team.

COAT 02Preparation

Preparation at scale

The same rules apply as in a garage, only larger. Old coatings and adhesive are removed, high spots are ground down and the slab is opened for the primer. Joints and cracks are repaired, and any patch that has failed is cut back and rebuilt.

Large areas show every variation in the slab. A pour that was finished on a different day, a repair from an earlier tenant or a section that has been overloaded will all read differently once a coating is on. Those areas are identified during the assessment so the finish is even and the coating behaves the same way across the floor.

COAT 03Operations

Planning around operations

Phasing is usually the difference between a job that happens and a job that keeps getting postponed. The floor is divided into areas, each with its own preparation, coating and cure window. Traffic is routed around the closed area, and the next section starts when the previous one can take it.

Overnight and weekend work is common, with the trade off of more setup and more mobilisation. Cure windows are set out in the schedule so the business knows when each area comes back, and the handover is done area by area rather than at the end.

COAT 04Suitability

Where commercial epoxy fits

Warehouses, workshops, service bays, storage areas and retail back of house are the usual candidates. The system follows what the floor has to survive: trolley traffic, dropped stock, cleaning chemicals, vehicle movement or foot traffic.

Front of house retail is a different decision. A coating there is part of the finish of the space, so the colour, the sheen and the seams matter as much as the wear layer. That is a conversation about the look, not only about the product.

COAT 05Winter

Winter and cold slabs

Heated commercial space can be coated year round, provided the temperature holds through the cure. Loading doors are the weak point: a door that opens to a cold yard will drop the slab temperature at the threshold, and that edge is where the coating will struggle first.

Where a building is not heated, the schedule has to wait for the slab to be in range. Salt and slush tracked in from outside also have to be managed during the work, because a wet, salty floor is not a surface any coating will bond to.

COAT 06Questions

Commercial floor questions

Can you work while the business is operating?

Often, yes. Phasing lets one area be closed and coated while the rest stays in use. It costs more in setup and cure windows, but it keeps the doors open.

How is dust handled on a commercial site?

Grinding runs with dust extraction, and the work area is contained with sheeting where the space allows it. Entrances and returns are protected so dust does not travel through the building.

Can the floor be coated in sections?

Yes, with planning. Each section needs an edge that can be joined cleanly, and the seams are set where traffic and cleaning will not work against them.

Do you work with property managers and contractors?

Yes. Scopes, access arrangements and phasing can be set out for a property manager or a general contractor, with the cure windows written into the schedule.

COAT 07Start a project

Request a consultation

Tell us about the room, the slab and the timing. We reply by email, usually with a few questions about moisture, access and how the floor will be used.

Prefer email? info@epoxyflooringorleans.com

Your details are used to reply to this request. See the privacy policy.